Earthquake and Tsunami Emergency Support Project Component 6 : Spatial Planning and Environmental Management (ADB GRNT 0002-INO)

a) Nanggroe Aceh Darussalam, b) I. October 2005 to April (6 months), II. May – July 2006 (2 months), c) I. Ecological and Environmental Risk Assessment Specialist/National Co-Team Leader, II. Deputy Project Team Leader/Planner, d) I. Compiled existing information on status on marine and terrestrial rapid assessment to date and identified essential data gaps. Carried out ecological assessment studies/survey, based upon field work, satellite imagery and aerial photo-graphy, relating to critical habitats and important biodiversity areas in and adjacent to the damaged coastal areas. Rapid analysis of pollution hotspots. Identification and delineation of conservation areas. Identified and described overall damage status of ecological resources and develop recommendation for rehabilitation, appropriate land uses, etc., in close collaboration with spatial planner/land use planner. Coordinated with other initiatives through the ETESP and other government and donor assisted programs. Developed ETESP guideline for procurement of environmentally friendly construction materials with a particular emphasis on the use of timber materials from Sumatra. Synthesized/analyzed spatial information and developed recommendations to be readily used for environmentally sound land use planning. II. Assist International Team Leader in overall project direction and staff management. Provide overall expert advice to field specialists and assist in coordinating development of Kecamatan plans. Prepare outline sector profiles and planning options. Provide overall advice to central, provincial and local Government on spatial and integrated land use planning, e) 8 months

Zone Arrangement of Marine and Coastal Areas in Sambas District, West Kalimantan (Ministry Fisheries and Marine Affairs)

a) Indonesia, b) October – December 2004, c) Environmentalist, d) Identified and analyzed the problem, social economic potency and institutional development in marine coastal areas in Sambas District; assessed the policy and study research related the development of marine and coastal areas in Sambas District especially for agricultural sector; identified the condition of agricultural activities and land use; synthesized/analyzed spatial information; prepared zone arrangement of for agricultural development in marine coastal area of Sambas District, e) 3  months

Performance Evaluation of Forest Plant Utilization in Riau Province (Ministry of Forestry)

a) Indonesia, b) September 2004, c) Environmentalist, d) Reviewed the implementation of forest plant utilization activities to ensure the ecosystem stability; identified ecological status and condition of community activities surrounding plantation; synthesized/analyzed spatial information; developed recommendation on accurate indicators for forest plant utilization activities, e) 1  month

Performance Evaluation of Forest Plant Utilization Activities in West Kalimantan Province (Ministry of Forestry)

a) Indonesia, b) August 2004, c) Environmentalist, d) Reviewed the implementation of forest plant utilization activities to ensure the ecosystem stability; identified ecological status and condition of community activities surrounding plantation; synthesized/analyzed spatial information; developed recommendation on accurate indicators for forest plant utilization activities, e) 1  month

Community Empowerment in Horticulture Business Management in Cianjur District, (Bappeda Cianjur District)

a) Indonesia, b) May – July 2004, c) Team Leader/ Agricultural Ecologist, d) Identified stakeholders involved in horticulture business, potency and constraint in horticulture business management, and analysis of benefit proportion accept by each stakeholder; synthesize/analyze spatial information; delivered strategy to empower stakeholder skills and knowledge in horticulture business management, e) 3  months

Action Plan Implementation of Regional Production Centre Development Program in Central Sulawesi, Bappeda Central Sulawesi

a) Indonesia, b) Sept. 2000 – Mar. 2001, c) Agricultural Ecologist, d) Conducted analysis to the potency and challenge of regional center production at Central Sulawesi; implemented action plan with strategic steps for regional center production development; identified regional potency such geography, physic and social economic; synthesized/analyzed spatial information; prepared integrated and sustainable planning in the regional center production development, e) 7 months

Development of Regional Production Centre Concept (Regional Development Agency, Ministry of Home Affairs)

a) Indonesia, b) Sept. 1999 – March 2000, c) Agricultural Ecologist, d) Conducted study and analysis to the concept development of regional production center as local development model with regional approach; identified regional potency such geography, physic and social economic; analyzed relation among sector development, agribusiness system, ecological sound and regional development, synthesized/analyzed spatial information; developed regional production centre concept based on local resources, e) 7 months

Cimanuk Watershed Conservation and Management Project (World Bank funded)

a) Indonesia, b) April 1999 – December 1999, c) Agricultural Ecologist, d) Collected data and developed database of land resources utilization; evaluated land quality and prepared arrangement of sustainable land resources utilization; based on field survey and data collected, developed cultivation system and product diversity at watershed areas, e) 9 months

Survey and Evaluation of the Impact of Drought to Food and Seed Supply for Village Communities in East Timor Province

a) Indonesia, b) April 1998, c) Team Leader/ Agricultural Ecologist, d) Conducted survey to identify the effect of drought in 1997 on food and seed supply for village communities at sites; collected information from related institutions on the food and seed supply condition; conducted monitoring to the seed distribution activities for farmers such as corn seed, etc.; prepared reports and recommendations, e) 1 month

Agricultural Development Project in Batam Island (Batam Authority)

a) Indonesia, b) June 1985 – March 1986, c) Field Manager/ Agricultural Ecologist, d) Coordinated study in the field to develop agricultural sector at Batam Island; Conducted assessment on existing agricultural development in the sites that include physical soil aspect, social economic aspect, etc; managed planting activities in the fields; conducted pilot project on horticulture planting with hydroponics system, e) 10 months intermittent

Land Reclamation of Transmigration Unit at Sebulussalam, South Aceh, DI Aceh (Ministry of Transmigration)

a) Indonesia, b) Sept 1984 – March 1985, c) Field Manager/ Agricultural Ecologist, d) Collected data and information of the land reclamation activities and plant production experiments in the sites; Managed the reclamation activities and plant production experiment in the sites by planting the plants that covered the soil and rubber; developed system to improve the production of food crop such as corn and peanut, e) 7 months

The Land Preparation and Transmigration Resettlement in Sitiung, Sawah Lunto- Sijunjung, West Sumatra Province (Ministry of Transmigration)

a) Indonesia, b) Aug 1983 – March 1984, c) Field Manager / Agricultural Ecologist, d) Reviewed the land condition including conducted soil sample test, demonstration farm activities, fields experience at project site; managed the land preparation for farming and planting activities; developed optimize  for coffee, paddy and corn production; developed farming analysis to the land conservation; prepared reports, e) 8 months